.

Wednesday, February 27, 2019

Ramji Bhai Vasava Essay

G.H.Patel Post ammonia alum Institute of Business Management, Vallabh Vidhyanagar, Anand In the undivided Bombay province was worked out to haoma earthen decameters and problems faced while building a dam across the rivers Lokmata and Sadmata in northern Gujarat and further issues encountered while a scheme is do to raise the control levels of it. The objective of the case is to maximize the irrigation potential of the dam while respecting the religious sentiments of the people. The options are either to implement the former intend in its present form or the latter by convince the people of its benefits and deal with the issues faced. The conclusion is to try and implement the new formulate resulting in maximization of irrigation and revenues. PROPOSAL 1 PROPOSAL 2 grating cost 1.7 Approximate cost 1.9 Water confiscate 4700 Water impound 5700 Full supply level -592 Full supply level-595 Highest flood out level-596 highest flood level-606 OBJECTIVES* Government aim for sparing development through agricultural development. * base the damPROBLEM* Opposition of people to temple getting settle* People getting stirred due to submerge of villagesCONSTRAIN* locating of damCRITERIA* Maximum irrigation* borderline people affected* Maximum returns* Minimum time* Minimum costPRIORITY* Minimum people affected* Minimum cost* Minimum time* Minimum returns* Maximum irrigationALTERNATIVES* convince villages to shift temple* Resettlement of affected people* Raising crown of the templeACTION PLANGovernment should follow proposal 1 as temple was saved using gates from flood so that minimum people are affected so the cost incurred is as well low and the time required is minimum and also there is irrigation which leads to economic development. CONTINGENCY PLAN* Raising height of the temple* Go with proposal 2 if proposal 1 does not work

No comments:

Post a Comment